快活app官网

Single-Source Contingency

See the 快活app官网. Transmission, Markets, and Services Tariff, Attachment G Procedure to Protect for the Loss of Phase II Imports, which describes the process used by 快活app官网, New York 快活app官网, and PJM to monitor their respective systems and provide the data required by 快活app官网 to calculate import limits on the Phase I/II high-voltage direct-current interconnection between it and Hydro-Qu茅bec Trans脡nergie.

Download a report on single-source contingencies, limits placed on external and generation interfaces in which losing a single piece of equipment could cause a loss of 1,200 or greater megawatts (MW).

The single-source contingency limit is the base limit plus the authorized margin multiplied by the margin sensitivity. The NY Central-East single-source contingency limit is based on the authorized margin divided by the Distribution Factor (0.30). The margin associated with NY Station Voltages has been converted to MW.

Note: The compilation of this data has various origins and is provided for the convenience of the New England market participants. The 快活app官网 does not assume responsibility for the accuracy.

 
Single-Source Contingency
Description Timestamp Download
Current - April 02, 2025 04/02/2025 08:31 AM EDT CSV
March 19, 2025 03/19/2025 11:56 PM EDT CSV
March 20, 2025 03/20/2025 11:56 PM EDT CSV
March 21, 2025 03/21/2025 11:56 PM EDT CSV
March 22, 2025 03/22/2025 11:56 PM EDT CSV
March 23, 2025 03/23/2025 11:56 PM EDT CSV
March 24, 2025 03/24/2025 11:56 PM EDT CSV
March 25, 2025 03/25/2025 11:56 PM EDT CSV
March 26, 2025 03/26/2025 11:56 PM EDT CSV
March 27, 2025 03/27/2025 11:56 PM EDT CSV
March 28, 2025 03/28/2025 11:56 PM EDT CSV
March 29, 2025 03/29/2025 11:56 PM EDT CSV
March 30, 2025 03/30/2025 11:56 PM EDT CSV
March 31, 2025 03/31/2025 11:56 PM EDT CSV
April 01, 2025 04/01/2025 11:56 PM EDT CSV