Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
April 03, 2025 04/02/2025 12:50 PM EDT CSV
March 30, 2025 03/29/2025 12:53 PM EDT CSV
March 31, 2025 03/30/2025 12:53 PM EDT CSV
April 01, 2025 03/31/2025 12:57 PM EDT CSV
April 02, 2025 04/01/2025 12:43 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 04/03/2025 06:45 AM EDT CSV
March 30, 2025 03/30/2025 11:35 PM EDT CSV
March 31, 2025 03/31/2025 10:35 PM EDT CSV
April 01, 2025 04/01/2025 11:55 PM EDT CSV
April 02, 2025 04/02/2025 11:10 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/03/2025 06:36 AM EDT CSV
March 30, 2025 03/30/2025 11:21 PM EDT CSV
March 31, 2025 03/31/2025 11:21 PM EDT CSV
April 01, 2025 04/01/2025 11:21 PM EDT CSV
April 02, 2025 04/02/2025 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/02/2025 11:17 AM EDT CSV
March 28, 2025 03/31/2025 11:26 AM EDT CSV
March 29, 2025 03/31/2025 12:31 PM EDT CSV
March 30, 2025 03/31/2025 01:26 PM EDT CSV
March 31, 2025 04/01/2025 01:32 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 04/02/2025 11:17 AM EDT CSV
March 28, 2025 03/31/2025 11:26 AM EDT CSV
March 29, 2025 03/31/2025 12:31 PM EDT CSV
March 30, 2025 03/31/2025 01:26 PM EDT CSV
March 31, 2025 04/01/2025 01:31 PM EDT CSV